Frequently Asked Questions
Energy Transition Program
Corporate Green Power Programme
Is there any specific charges by TNB or SB when participating in CGPP such as charges on verification of REC etc
Will there be any wheeling charges?
What is the definition of Local Financial Institution.
For eventual awarded CC participating in the CGPP program, will the CC still needs to pay for ICPT?
Will the ICPT in the CC's TNB Bill be exempted for the amout of energy (kWh) that is contracted (or supplied) under the CGPP with the SPP?
Does the maximum demand charge to corporate consumer by TNB potentially reduced due to this VPPA scheme?
Is the CC able to enjoy electrical saving by participating in CGPP?
If the plant is connected at 132kV level with 29.99MW, would it qualify as Price Taker?
We are a local financial strong company, obtained local bank support with term sheet and own the land for the plant with no objection letter obtained from authorities . Can we straight to apply for the 30MW NEDA instead of CGPP?
Please advice if 132kV substation that is not in the list is allowed if preliminary check with PSS consultant shows that injection is feasible.