Pengguna

Senarai pepasangan yang terlibat di bawah Peraturan-Peraturan Pengurusan Tenaga Elektrik Dengan Cekap 2008 (PPTEC 2008)

Installation which consume or generate electrical energy for own consumption equal or more than 3,000,000 kWh for 6 consecutive months are mandated to comply with the regulation under EMEER 2008.

Listed are all the affected installations which still do not comply with the regulation according to state.

  1. JOHOR
  2. KEDAH
  3. KELANTAN
  4. KUALA LUMPUR
  5. MELAKA
  6. NEGERI SEMBILAN
  7. PAHANG
  8. PERAK
  9. PERLIS
  10. PULAU PINANG
  11. PUTRAJAYA
  12. LABUAN
  13. SELANGOR
  14. TERENGGANU

 

Please click here for EMEER 2008 Checklist.