Frequently Asked Questions
Corporate Green Power Programme
Penyertaan NEDA
Semakan/Kajian Awal/PSS
Please advice if 132kV substation that is not in the list is allowed if preliminary check with PSS consultant shows that injection is feasible.
Is Full PSS is required for NEDA? or PSS stage 1?
If PSS rejected by TNB at NEDA stage, does it meant the CGPP application will be fully rejected?
Can interconnection solution be changed later if the PSS is not favourable?
Penyelesaian
If the CGPA price is higher than SMP price, can the Solar Producer collect payment difference in RM (actual cash transaction) from Consumer to make up for the amount of difference.
What is the expected price of these VPPAs?
In the event that the price agreed between corporate consumer = SMP, the corporate consumer will still need to pay the energy utility company the normal electricity tariff? ie. payment (toll) to use the transmission and distribution system.
If the Corporate Consumer consumed 1000kWh during day and 500kWh during night. The solar plant produces 1500kWh (basically during daytime only) will the solar plant producer being paid 1500kWh or 1000kWh?
How SMP is determined? is the SMP change every 30 mins or SB shall declare a monthly average SMP between 7am to 7pm similar to NEM NOVA SMP declaration?