FAQ Preliminary check/study/PSS Can interconnection solut… ‹ Preliminary check/study/PSS Can interconnection solution be changed later if the PSS is not favourable? No. The application is considered unsuccessful. Preliminary check/study/PSS Please advice if 132kV substation that is not in the list is allowed if preliminary check with PSS consultant shows that injection is feasible. ↗ Is Full PSS is required for NEDA? or PSS stage 1? ↗ If PSS rejected by TNB at NEDA stage, does it meant the CGPP application will be fully rejected? ↗