Settlement
If the Corporate Consumer consumed 1000kWh during day and 500kWh during night. The solar plant produces 1500kWh (basically during daytime only) will the solar plant producer being paid 1500kWh or 1000kWh?
If the solar plant falls under the Price Taker category, then the energy it produces will be paid at the Actual SMP (in this case 1500kWh, provided it is within its registered capacity under NEDA).
Settlement
What does it mean by bid is successful for large merchant generator? Is there any risk any energy generated is not being paid? Or should the large merchant generator will be paid same as the price taker?
How SMP is determined? is the SMP change every 30 mins or SB shall declare a monthly average SMP between 7am to 7pm similar to NEM NOVA SMP declaration?
How SMP is determined? is the SMP change every 30 mins or SB shall declare a monthly average SMP between 7am to 7pm similar to NEM NOVA SMP declaration?
What does it mean by bid is successful for large merchant generator? Is there any risk any energy generated is not being paid? Or should the large merchant generator will be paid same as the price taker?