Di bawah Klausa 8.13 Garis Panduan, "GEP hendaklah mengisytiharkan Output Firm untuk penjadualan sehari lebih awal (day-ahead) dalam Antara Muka Peserta Pasaran (MPI)". i. Apakah imbangan/toleransi yang dibenarkan bagi penjadualan sehari lebih awal? ii. P
Jawapan:
i. Kami tidak menetapkan imbangan/toleransi yang dibenarkan bagi penjadualan sehari lebih awal.
ii. Setiap selang masa setengah jam.
CRESS
How is wheeling availability is determined?
Are there any limitations to the interconnection (export capacity) other than the PSS? i.e. Is the interconnection capacity set at 50% of the plant AC capacity?
Are there any limitations to the interconnection (export capacity) other than the PSS? i.e. Is the interconnection capacity set at 50% of the plant AC capacity?
How is wheeling availability is determined?
Under clause 8.14(a), the BESS is “dispatchable by GSO as per system requirements”. Under what circumstances will GSO be dispatching power from the BESS— i. Is this for emergency / occasional use only under unusual circumstances, and otherwise, the RED w