Frequently Asked Questions
Energy Transition Program
Corporate Green Power Programme
CRESS
How is the excess energy of GEP due to the imbalance of generation and consumption determined?
i. The generation of GEP is higher than the consumption of GC at any point of time as per Clause 6.11; or
ii. The total actual generation of GEP exceeds the total consumption of GC, which is calculated on the last day of the month, regardless of hourly generation and consumption as per Clause 8.12?
Clarity on Firm and Non-Firm
Is switching from Non-Firm to Firm Over Time allowed?
Is there a time limit on the duration to Sell Excess Energy at 8 sen/kWh?
Under clause 8.14(a), the BESS is “dispatchable by GSO as per system requirements”. Under what circumstances will GSO be dispatching power from the BESS—
i. Is this for emergency / occasional use only under unusual circumstances, and otherwise, the RED will dispatch the BESS under normal circumstances, or
ii. Will GSO maintain sole dispatch control of the BESS?
For (i) Is there any rules governing how the RED dispatches the power from the BESS?