Frequently Asked Questions
Energy Transition Program
CREAM
Is there a quota imposed for CREAM? If yes, what is timeline for the quota?
Could we clarify on how the CAC rate is determined, reviewed, and potentially increased (limit up to 15% every 3 years).
Is there any transparency on the calculation and billing methodology of CAC for planning long-term project economics?
CRESS
Is a RED permitted to sign FCAS (Frequency Control Ancillary Services) agreements with the grid operator for a qualifying BESS system developed within a solar farm, as well as for standalone projects?
In the industrial dialogue held on 23 Aug, it was explained that only 50% of the maximum capacity of the solar power plant will be exported to grid and the rest will be used to charge battery. Is this mechanism still valid under CRESS Guideline?
What is the dispatch priority during solar energy generation? E.g. is it to fully charge the BESS first and export to grid once BESS is fully charged or vice versa? Or is the battery mainly to help firm up/smooth out the half-hourly firm output?
Under clause 8.14(a), the BESS is “dispatchable by GSO as per system requirements”. Under what circumstances will GSO be dispatching power from the BESS—
i. Is this for emergency / occasional use only under unusual circumstances, and otherwise, the RED will dispatch the BESS under normal circumstances, or
ii. Will GSO maintain sole dispatch control of the BESS?
For (i) Is there any rules governing how the RED dispatches the power from the BESS?
What is the defined hours of operation with BESS? As during the townhall, the sample was operating between 9 AM to 9 PM. Can we operate beyond 12 hours, for example, from 9 AM to 11 PM?
Is there Capacity Payment for Battery?
What is the Minimum Capacity Factor (CF) for Battery?