ICB Track 3A & 3B
Announcement: Coal fired power plant open bidding
The Energy Commission (EC) is calling for Request For Qualification (RFQ) responses for the development of a 1000 MW (Fast Track Project 3A) supercritical/ultra-supercritical coal fired power plant to be commissioned in Oct 2017, and another 2 x 1000MW (Project 3B) coal plant at a new site that is scheduled to be in operation in stages in Oct 2018 and April 2019.
Foreign developers with relevant experience are encouraged to form relationships with Malaysian partners as early as possible. Maximum allowable foreign equity is 49% and suitable foreign developer will be allowed to lead a consortium. The pre-qualification exercise is to screen the prospective bidder/consortium, proposed site and power evacuation line.
A joint RFQ document is now available for sale at EC Building in Precinct 2, Putrajaya during office hours from 18 December 2012 to 4 January 2013 at a price of RM5,000.00. Prospective bidders may submit RFQ responses for either one or both projects before or on the following closing dates:
1) 1000 MW Fast Track Project 3A Submission Date - 21 January 2013
2) 2000 MW Project 3B Submission Date - 11 March 2013
1000 MW Fast Track Project 3A:
Bidders will be responsible for securing a site adjacent or near an existing interconnection facility or substation. Demonstration of rights to utilise the proposed site and land for the transmission link to the substation will be required. Due to the fast track timeline, any proposal involving wayleave application will therefore not be accepted.
2000 MW Project 3B:
Bidders will be responsible for identifying and securing an appropriate site. The project scope will include the transmission line to the 500kV grid system. The RFQ requirements will therefore include a transmission line preliminary route survey report and demonstration of rights to utilise the proposed site.
Prospective bidders are advised to start work immediately on site identification, preliminary route survey and consortium formation. Bidders will find six (6) approved nodes along the 500kV Grid through which power will be injected.
cb3@st.gov.my
Energy Commission
18 December 2012
[ Payment in Malaysian Ringgit by Bankers Cheque to SURUHANJAYA TENAGA ]
Prospective Bidders
The Energy Commission has issued 30 RFQ documents to the following prospective bidders:
| NO. | COMPANY NAME |
| 1. | 1 Malaysia Development Berhad |
| 2. | Amcorp Power |
| 3. | Automan Energy Sdn. Bhd. |
| 4. | Benalec Sdn. Bhd. |
| 5. | Daelim (M) Sdn. Bhd. |
| 6. | Daewoo International (M) Sdn Bhd |
| 7. | Dhaya Maju Infrastructure Sdn. Bhd. |
| 8. | FajarBaru Builder Sdn. Bhd. |
| 9. | FKH Holdings Sdn. Bhd. |
| 10. | Global Power Ventures Sdn. Bhd. |
| 11. | GUH Holdings |
| 12. | Ho Hup Construction Sdn. Bhd. |
| 13. | Jimah Energy Ventures |
| 14. | Malakoff Corporation Berhad |
| 15. | Marubeni Asia Power Singapore Pte Ltd |
| 16. | Mitsubishi Corporation |
| 17. | Mitsui & Co. Ltd |
| 18. | NextGen Power Resources Sdn. Bhd. |
| 19. | Powertek Energy |
| 20. | Ranhill Power Sdn Bhd |
| 21. | Semb Corporation |
| 22. | Siemens |
| 23. | SIPP Energy Sdn. Bhd. |
| 24. | Sumitomo Corporation |
| 25. | Tadmax Energy Sdn. Bhd. |
| 26. | Teknologi Tenaga Perlis Consortium Sdn. Bhd. |
| 27. | Tenaga Nasional Berhad |
| 28. | TRIplc Berhad |
| 29. | TSR Capital Berhad |
| 30. | YTL Power International Berhad |
Energy Commission, 8th January 2013
Coal fired power plant open bidding: Pre-qualification results for 1000MW Project 3A
The Energy Commission has completed the evaluations of both RFQ Submissions dated 21st January 2013 from the following participants:
1) Tenaga Nasional Berhad and Marubeni Corporation, and
2) 1Malaysia Development Berhad and Mitsui & Co. Ltd.
Both consortia have proposed an acceptable project site respectively in Manjung, Perak and Jimah, Negeri Sembilan and met all the requirements for pre-qualification.
Shortlisted bidders are invited to purchase the Request For Proposal document for the 1000MW Project 3A beginning 8th February 2013. The RFP Submission closing date will be 20th May 2013 at 12.00 noon.
Energy Commission
7th February 2013
Open Tender for 2000 MW Coal-fired Power Plant Project 3B – RFQ participants responding to the pre-qualification process
The Energy Commission has received seven (7) RFQ submissions as at 1200 hrs on 11th March 2013 for the purposes of pre-qualification of developer consortium, power plant site and power evacuation line.
Initially 30 RFQ documents were purchased by interested parties from 18th December 2012 to 4th January 2013. The RFQ evaluation results are expected to be announced by early April 2013 and shortlisted bidders will be invited to participate in the 2000 MW coal-fired power plant tender.
| No. | RFQ Submissions By: |
| 1. | 1Malaysia Development Bhd; and Mitsui & Co. Ltd. |
| 2. | Automan Energy Sdn Bhd. |
| 3. | Formis Resources Berhad; SIPP Energy Sdn Bhd; POSCO Energy Co. Ltd.; and POSCO Engineering & Construction Ltd.. |
| 4. | Global Power Ventures Sdn Bhd; Tenaga Nasional Berhad; and China National Machinery Import & Export Corporation (CMC). |
| 5. | Malakoff Corporation Berhad; and Sumitomo Corporation |
| 6. | Tadmax Energy Sdn. Bhd. |
| 7. | YTL Power International Berhad; and Ranhill Power Sdn Bhd. |
Energy Commission, 11 March 2013
2000MW Coal-fired Power Plant Open Tender – Shortlisted bidders pursuant to Project 3B pre-qualification process
The Energy Commission has completed the evaluation of seven RFQ submissions and the following consortia have been shortlisted to participate in the tender exercise for the 2000MW Project 3B coal-fired power plant to be developed at their own site.
| No. | Shortlisted Bidders | Lead Member | Proposed Site |
| 1. | 1Malaysia Development Bhd; and Mitsui & Co. Ltd. |
1MDB | Jimah, N.S. ( Injection at Olak Lempit ) |
| 2. | Formis Resources Berhad, SIPP Energy Sdn Bhd, Posco Energy and Posco Engineering & Construction Co. Ltd. |
Formis | Tanjung Tohor, Johor. ( Injection at Yong Peng East) |
| 3. | Tenaga Nasional Berhad, Global Power Ventures Sdn Bhd and China National Machinery Import & Export Corporation. |
TNB | Tanjung Hantu - Segari, Perak. ( Injection at Terong, Bruas ) |
| 4. | Malakoff Corporation Berhad and Sumitomo Corporation |
Malakoff | Pulau Carey, Selangor. ( Injection at Olak Lempit ) |
| 5. | YTL Power International Berhad and Ranhill Power Sdn Bhd. |
YTLP | Tanjung Tohor, Johor. ( Injection at Yong Peng East) |
RFP document is expected to be released on 23rd April 2013 and invitation letters will be issued shortly. The closing date for the Bid will be 30th September 2013.
All shortlisted bidders, including each member of the consortium, will be required to sign an Integrity Pact.