No | Tajuk | Tarikh | Pautan |
---|---|---|---|
1 | Guidelines for the Approval of Electrical Equipment | 26/07/2024 | Muat Turun |
2 | "Garis Panduan Pendawaian Elektrik Pepasangan Domestik" | 24/07/2024 | Muat Turun |
3 | Guidelines For Ring-Fencing of The System Operator (Peninsular Malaysia) 2016 | 19/07/2024 | Muat Turun |
4 | Guidelines for Solar Photovoltaic Installation Under The Programme Of NEM Rakyat and NEM GoMEn In Peninsular Malaysia | 04/07/2024 | Muat Turun |
5 | Guidelines on The Implementation of Interval Billing Mechanism | 04/07/2024 | Muat Turun |
6 | Information Guide For Corporate Green Power Programme (For Solar PV Plant) | 21/06/2024 | Muat Turun |
7 | Guidelines on Green Electricity Tariff | 30/04/2024 | Muat Turun |
8 | Guide for Cross-Border Electricity Sales | 22/04/2024 | Muat Turun |
9 | Guidelines on Minimum Energy Performance Standard (MEPS) for Electric Oven | 16/04/2024 | Muat Turun |
10 | Guidelines on Large Scale Solar PV Plant for Connection to Electricity Network | 16/04/2024 | Muat Turun |
11 | Guidelines on Electricity Tariff Determination under IBR for Sabah and Federal Territory of Labuan 2023 | 29/03/2024 | Muat Turun |
12 | Guidelines for Solar Photovoltaic Installation Under Net Offset Virtual Aggregations (NOVA) Programme For Peninsular Malaysia | 05/02/2024 | Muat Turun |
13 | Guidelines on the Connection of Solar Photovoltaic Installation for Self-Consumption | 15/07/2023 | Muat Turun |
14 | Performance Standard of Electricity Supply Services of SESB | 13/07/2023 | Muat Turun |
15 | "Panduan Prosedur Tuntutan Kerugian Hasil oleh Pemegang Lesen bagi Kes-Kes Penggunaan Elektrik dengan Curang" | 06/07/2023 | Muat Turun |
16 | Guide on Gas Permit to Work System | 30/05/2023 | Muat Turun |
17 | Guidelines on Electricity Tariff Determination Under IBR for Peninsular Malaysia 2022 | 15/03/2023 | Muat Turun |
18 | Guidelines on Electricity Tariff Determination Under IBR for Kulim Hi Tech Park | 15/03/2023 | Muat Turun |
19 | Guidelines for Single Buyer Sabah & F.T. Labuan 2023 | 01/03/2023 | Muat Turun |
20 | Guidelines for System Operator Sabah & F.T. Labuan 2023.pdf | 01/03/2023 | Muat Turun |
21 | Guidelines on Best Available Technologies for Thermal Enery Efficiency of Boilers in Malaysia | 21/02/2023 | Muat Turun |
22 | Cogeneration: An Energy Efficient Technology (2022 Edition) | 10/01/2023 | Muat Turun |
23 | Guide on Electric Vehicle Charging System (EVCS) | 29/07/2022 | Muat Turun |
24 | Guide to Efficient Use of Electricity at Home (2020 Edition) | 27/01/2022 | Muat Turun |
25 | Performance Standard of Electricity Supply Services of TNB | 02/09/2021 | Muat Turun |
26 | Guidelines on Electricity Tariff Determination Under Incentive Based Regulation (IBR) For Peninsular Malaysia 2021 | 17/05/2021 | Muat Turun |
27 | Energy Efficiency Labelling Guideline for Freezer | 17/03/2021 | Muat Turun |
28 | Guidelines on Advanced Metering Infrastructure | 08/07/2020 | Muat Turun |
29 | Guidelines on Demarcation of Licence & Maintenance Downstream of City Gate Station | 03/07/2020 | Muat Turun |
30 | Energy Efficiency Labelling Guideline for Electric Rice Cooker | 17/03/2020 | Muat Turun |
31 | Guidelines on Gas Piping Systems at Launderettes and Similar Installations | 17/03/2020 | Muat Turun |
32 | Energy Efficiency Labelling Guideline for Microwave Oven | 28/02/2020 | Muat Turun |
33 | Energy Efficiency Labelling Guideline for Television | 09/01/2020 | Muat Turun |
34 | Guidelines for New Enhanced Dispatch Arrangement | 12/12/2019 | Muat Turun |
35 | Guide on the Subscription and Management of MyGreen+ | 23/10/2019 | Muat Turun |
36 | Guideline on Submission of Business Plan | 13/02/2019 | Muat Turun |
37 | Guidelines for Setting Up Custody Transfer Metering Station at Entry and Exit Points | 13/02/2019 | Muat Turun |
38 | Guidelines on Electricity Tariff Determination Under Incentive Based Regulation (IBR) For Peninsular Malaysia 2018 | 27/12/2018 | Muat Turun |
39 | Guidelines on Determination of Gas Distribution Facility Tariff Under Incentive-Based Regulation (IBR) | 14/11/2018 | Muat Turun |
40 | Guidelines on Determination of Gas Transportation Facility Tariff Under Incentive-Based Regulation (IBR) | 14/11/2018 | Muat Turun |
41 | Guidelines on Determination of Regasification Facility Tariff Under Incentive-Based Regulation (IBR) | 14/11/2018 | Muat Turun |
42 | Guidelines for Single Buyer Market (Peninsular Malaysia) | 17/07/2018 | Muat Turun |
43 | List of Regulated Electrical Equipment | 07/06/2018 | Muat Turun |
44 | Guideline for Electricity Meters: Approval, Testing and Initial Verification Requirements | 05/06/2018 | Muat Turun |
45 | Frequently Asked Questions on Third Party Access System | 31/05/2018 | Muat Turun |
46 | Guide on Issuance of Certificate of Approvals and Labelling of Domestic Gas Cooking Appliances | 23/04/2018 | Muat Turun |
47 | Guide on (1) Conduct of Repair Work and (2) Testing, Commissioning, Decommissioning and Recommissioning of Installations | 11/04/2018 | Muat Turun |
48 | Guide on Piped Gas Safety Management Plan and Programme | 11/04/2018 | Muat Turun |
49 | Energy Efficiency Labelling Guideline for Refrigerator | 01/03/2018 | Muat Turun |
50 | Energy Efficiency Labelling Guideline for Air-Conditioner | 01/03/2018 | Muat Turun |
51 | Energy Efficiency Labelling Guideline for Washing Machine | 01/03/2018 | Muat Turun |
52 | Guide on Applications for and Renewal for Certificate of Approval Assemblers, Manufacturers or Importers of Gas Fittings, Gas Appliances and Equipment & Gas Fittings, Gas Appliances and Equipment | 02/01/2018 | Muat Turun |
53 | Guidelines on Business Plan Submission by Licensee | 01/08/2017 | Muat Turun |
54 | Non-Domestic Electrical Installation Safety Code | 05/07/2017 | Muat Turun |
55 | Guideline for The Design, Installation, Inspection, Testing, Operation and Maintenance of Water Heater Systems | 13/06/2017 | Muat Turun |
56 | Guidelines on Connection Charges for Sabah Electricity Sdn. Bhd. (SESB) | 20/04/2017 | Muat Turun |
57 | Guideline on Electrical Safety Management Plan and Programme | 30/03/2017 | Muat Turun |
58 | Guidelines for Implementation of Gas Framework Agreement (GFA) in The Power Sector | 28/03/2017 | Muat Turun |
59 | Third Party Access Code for Malaysian Distribution Pipelines | 16/01/2017 | Muat Turun |
60 | Third Party Access Code for Malaysian Transmission Pipelines | 16/01/2017 | Muat Turun |
61 | Third Party Access Code for Malaysian Regasification Terminals | 16/01/2017 | Muat Turun |
62 | Guidelines on Licence Application | 16/01/2017 | Muat Turun |
63 | Guidelines on Competition for the Malaysian Gas Market in relation to Market Definition, Anti-Competitive Agreements and Abuse of Dominant Position | 16/01/2017 | Muat Turun |
64 | Electrical Energy Audit Guidelines for Building | 26/10/2016 | Muat Turun |
65 | Guidelines On Tariff Determination Under Incentive Based Regulation for Tenaga Nasional Berhad | 13/10/2016 | Muat Turun |
66 | Guidelines On Tariff Determination Under Incentive Based Regulation for Sabah Electricity Sdn. Bhd | 13/10/2016 | Muat Turun |
67 | Distribution Code for Peninsular Malaysia, Sabah & F.T. Labuan (Amendments) 2017 | 13/10/2016 | Muat Turun |
68 | Grid Code for Sabah and Labuan (Amendments) 2017 | 13/10/2016 | Muat Turun |
69 | Grid Code for Peninsular Malaysia | 13/10/2016 | Muat Turun |
70 | Guide to NEDA's Trial Run | 05/10/2016 | Muat Turun |
71 | Garis Panduan Pelaksanaan Pemeriksaan Berkala Dan Ujian Kebocoran Sistem Gas Berpaip | 23/09/2016 | Muat Turun |
72 | Garis Panduan Kaedah-Kaedah Keselamatan Pengguna Elektrik di Musim Banjir | 10/12/2015 | Muat Turun |
73 | Soalan-Soalan Lazim Isu Meter Elektrik | 23/09/2014 | Muat Turun |
74 | Guidelines on No-Cost and Low-Cost Measures for Efficient Use of Electricity in Buildings | 13/08/2014 | Muat Turun |
75 | Gas Piping System Safety Handbook For Domestic Consumer | 22/07/2014 | Muat Turun |
76 | Garis Panduan Persempadanan Pengurusan dan Penyenggaraan Sistem Pepasangan Elektrik dan Gas Berpaip di Bangunan | 25/03/2014 | Muat Turun |
77 | Guidelines On Licensing Under Section 9 of the Act [Electricity Supply Act 1990 (Act 447)] | 15/08/2013 | Muat Turun |
78 | Gas Safety Guidelines for School Laboratory | 06/07/2013 | Muat Turun |
79 | Save Energy, Save the Environment for the Future | 03/07/2013 | Muat Turun |
80 | Jimat Tenaga, Lestarikan Alam Sekitar Untuk Masa Depan | 03/07/2013 | Muat Turun |
81 | Wayleave for Electricity Supply Lines | 03/07/2013 | Muat Turun |
82 | Electrical Engineers | 03/07/2013 | Muat Turun |
83 | Electrical Services Engineers | 03/07/2013 | Muat Turun |
84 | Pemasangan Pagar Elektrik Mengikut Prosedur Yang Ditetapkan Oleh Suruhanjaya Tenaga | 03/07/2013 | Muat Turun |
85 | Cable Jointers | 03/07/2013 | Muat Turun |
86 | Wireman | 03/07/2013 | Muat Turun |
87 | Chargeman | 03/07/2013 | Muat Turun |
88 | Electrical Supervisors | 03/07/2013 | Muat Turun |
89 | Guidelines On Domestic Gas Piping System | 03/07/2013 | Muat Turun |
90 | Guidelines for Copper Gas Piping | 03/07/2013 | Muat Turun |
91 | Gas Supply Acts and Regulations Guidelines | 03/07/2013 | Muat Turun |
Suruhanjaya Tenaga,
No. 12, Jalan Tun Hussein, Presint 2, 62100 Putrajaya, Malaysia.
Toll Free: 1-800-2222-78 Tel: (603) 8870 8500 Fax: (603) 8888 8637
No. 12, Jalan Tun Hussein, Presint 2, 62100 Putrajaya, Malaysia.
Toll Free: 1-800-2222-78 Tel: (603) 8870 8500 Fax: (603) 8888 8637