Muat Turun

    
No Tajuk Tarikh Pautan
1 Guidelines on Green Electricity Tariff 16/07/2025 Muat Turun 355
2 Guide on Development of Regasification Terminal in Peninsular Malaysia 30/05/2025 Muat Turun 967
3 Grid Code for Peninsular Malaysia - Main Code 2025 21/05/2025 Muat Turun 705
4 Grid Code for Peninsular Malaysia - Additional Code 2025 21/05/2025 Muat Turun 592
5 "Panduan Permohonan Orang Kompeten Mengendalikan Lebih Dari Satu Pepasangan" 16/05/2025 Muat Turun 2,887
6 Guidelines for Solar Photovoltaic for Self-Consumption In Peninsular Malaysia (January 2025) 27/03/2025 Muat Turun 4,157
7 Guidelines on Electric Vehicle Charging System (EVCS) 17/03/2025 Muat Turun 4,365
8 "Garis Panduan Tuntutan Imbalance Cost Pass-Through (ICPT) Di Semenanjung Malaysia & Wilayah Persekutuan Labuan Bagi Pemegang Lesen Awam Pengagihan" 03/03/2025 Muat Turun 1,528
9 Guidelines For Solar Photovoltaic Installation Under The Programme Of NEM Rakyat And NEM GoMEn In Peninsular Malaysia 01/03/2025 Muat Turun 2,104
10 Guidelines for Solar Photovoltaic Installation Under Net Offset Virtual Aggregations (NOVA) Programme For Peninsular Malaysia 01/03/2025 Muat Turun 2,049
11 Guidelines For Corporate Renewable Energy Supply Scheme (CRESS) 01/03/2025 Muat Turun 3,596
12 Guidelines On Licence Application Under The Electricity Supply Act 1990 27/01/2025 Muat Turun 2,376
13 Guidelines For System Operator (Federal Territory of Labuan) 2023 27/01/2025 Muat Turun 923
14 Guidelines For Single Buyer (Federal Territory of Labuan) 2023 27/01/2025 Muat Turun 865
15 Guidelines on Determination of Gas Distribution Facility Tariff under Incentive-Based Regulation (Revision 2024) 31/12/2024 Muat Turun 943
16 Guidelines on Determination of Gas Transportation Facility Tariff under under Incentive-Based Regulation (Revision 2024) 31/12/2024 Muat Turun 833
17 Guidelines on Determination of Regasification Facility Tariff under Incentive-Based Regulation (Revision 2024) 31/12/2024 Muat Turun 800
18 Guidelines for Single Buyer Market (Peninsular Malaysia) 2018 22/11/2024 Muat Turun 1,330
19 Guidelines for New Enhanced Dispatch Arrangement 22/11/2024 Muat Turun 1,286
20 Guidelines for the Approval of Electrical Equipment 26/07/2024 Muat Turun 8,133
21 "Garis Panduan Pendawaian Elektrik Pepasangan Domestik" 24/07/2024 Muat Turun 8,955
22 Guidelines For Ring-Fencing of The System Operator (Peninsular Malaysia) 2016 19/07/2024 Muat Turun 1,933
23 Guidelines on The Implementation of Interval Billing Mechanism 04/07/2024 Muat Turun 2,286
24 Information Guide For Corporate Green Power Programme (For Solar PV Plant) 21/06/2024 Muat Turun 4,438
25 Guide for Cross-Border Electricity Sales 22/04/2024 Muat Turun 2,294
26 Guidelines on Large Scale Solar PV Plant for Connection to Electricity Network 16/04/2024 Muat Turun 3,577
27 Guideline on Large Scale Solar (LSS) Photovoltaic Plant for Connection to Electricity Networks 02/04/2024 Muat Turun 1,079
28 Guidelines on Electricity Tariff Determination under IBR for Sabah and Federal Territory of Labuan 2023 29/03/2024 Muat Turun 2,901
29 Performance Standard of Electricity Supply Services of SESB 13/07/2023 Muat Turun 3,315
30 "Panduan Prosedur Tuntutan Kerugian Hasil oleh Pemegang Lesen bagi Kes-Kes Penggunaan Elektrik dengan Curang" 06/07/2023 Muat Turun 3,014
31 Guide on Gas Permit to Work System 30/05/2023 Muat Turun 2,203
32 Guidelines on Electricity Tariff Determination Under IBR for Peninsular Malaysia 2022 15/03/2023 Muat Turun 4,500
33 Guidelines on Electricity Tariff Determination Under IBR for Kulim Hi Tech Park 15/03/2023 Muat Turun 3,000
34 Guidelines on Best Available Technologies for Thermal Enery Efficiency of Boilers in Malaysia 21/02/2023 Muat Turun 1,867
35 Cogeneration: An Energy Efficient Technology (2022 Edition) 10/01/2023 Muat Turun 3,240
36 Guide to Efficient Use of Electricity at Home (2020 Edition) 27/01/2022 Muat Turun 4,580
37 Performance Standard of Electricity Supply Services of TNB 02/09/2021 Muat Turun 5,945
38 Guidelines on Electricity Tariff Determination Under Incentive Based Regulation (IBR) For Peninsular Malaysia 2021 17/05/2021 Muat Turun 7,522
39 Guidelines on Advanced Metering Infrastructure 08/07/2020 Muat Turun 5,409
40 Guidelines on Demarcation of Licence & Maintenance Downstream of City Gate Station 03/07/2020 Muat Turun 1,959
41 Guidelines on Gas Piping Systems at Launderettes and Similar Installations 17/03/2020 Muat Turun 4,822
42 Guide on the Subscription and Management of MyGreen+ 23/10/2019 Muat Turun 2,223
43 Guideline on Submission of Business Plan 13/02/2019 Muat Turun 2,436
44 Guidelines for Setting Up Custody Transfer Metering Station at Entry and Exit Points 13/02/2019 Muat Turun 4,336
45 Guidelines on Electricity Tariff Determination Under Incentive Based Regulation (IBR) For Peninsular Malaysia 2018 27/12/2018 Muat Turun 5,664
46 List of Regulated Electrical Equipment 07/06/2018 Muat Turun 30,408
47 Guideline for Electricity Meters: Approval, Testing and Initial Verification Requirements 05/06/2018 Muat Turun 5,649
48 Frequently Asked Questions on Third Party Access System 31/05/2018 Muat Turun 4,445
49 Guide on Issuance of Certificate of Approvals and Labelling of Domestic Gas Cooking Appliances 23/04/2018 Muat Turun 3,376
50 Guide on (1) Conduct of Repair Work and (2) Testing, Commissioning, Decommissioning and Recommissioning of Installations 11/04/2018 Muat Turun 6,606
51 Guide on Piped Gas Safety Management Plan and Programme 11/04/2018 Muat Turun 3,818
52 Guide on Applications for and Renewal for Certificate of Approval Assemblers, Manufacturers or Importers of Gas Fittings, Gas Appliances and Equipment & Gas Fittings, Gas Appliances and Equipment 02/01/2018 Muat Turun 3,208
53 Guidelines on Business Plan Submission by Licensee 01/08/2017 Muat Turun 3,381
54 Non-Domestic Electrical Installation Safety Code 05/07/2017 Muat Turun 20,976
55 Guideline for The Design, Installation, Inspection, Testing, Operation and Maintenance of Water Heater Systems 13/06/2017 Muat Turun 15,437
56 Guidelines on Connection Charges for Sabah Electricity Sdn. Bhd. (SESB) 20/04/2017 Muat Turun 4,221
57 Guideline on Electrical Safety Management Plan and Programme 30/03/2017 Muat Turun 12,431
58 Guidelines for Implementation of Gas Framework Agreement (GFA) in The Power Sector 28/03/2017 Muat Turun 3,463
59 Third Party Access Code for Malaysian Distribution Pipelines 16/01/2017 Muat Turun 10,520
60 Third Party Access Code for Malaysian Transmission Pipelines 16/01/2017 Muat Turun 11,751
61 Third Party Access Code for Malaysian Regasification Terminals 16/01/2017 Muat Turun 11,515
62 Guidelines on Licence Application 16/01/2017 Muat Turun 18,360
63 Guidelines on Competition for the Malaysian Gas Market in relation to Market Definition, Anti-Competitive Agreements and Abuse of Dominant Position 16/01/2017 Muat Turun 7,649
64 Electrical Energy Audit Guidelines for Building 26/10/2016 Muat Turun 13,950
65 Guidelines On Tariff Determination Under Incentive Based Regulation for Tenaga Nasional Berhad 13/10/2016 Muat Turun 7,542
66 Guidelines On Tariff Determination Under Incentive Based Regulation for Sabah Electricity Sdn. Bhd 13/10/2016 Muat Turun 4,360
67 Distribution Code for Peninsular Malaysia, Sabah & F.T. Labuan (Amendments) 2017 13/10/2016 Muat Turun 43,189
68 Grid Code for Sabah and Labuan (Amendments) 2017 13/10/2016 Muat Turun 15,489
69 Grid Code for Peninsular Malaysia 13/10/2016 Muat Turun 90,679
70 Guide to NEDA's Trial Run 05/10/2016 Muat Turun 3,895
71 Garis Panduan Pelaksanaan Pemeriksaan Berkala Dan Ujian Kebocoran Sistem Gas Berpaip 23/09/2016 Muat Turun 8,657
72 Garis Panduan Kaedah-Kaedah Keselamatan Pengguna Elektrik di Musim Banjir 10/12/2015 Muat Turun 8,861
73 Soalan-Soalan Lazim Isu Meter Elektrik 23/09/2014 Muat Turun 97,208
74 Guidelines on No-Cost and Low-Cost Measures for Efficient Use of Electricity in Buildings 13/08/2014 Muat Turun 7,189
75 Gas Piping System Safety Handbook For Domestic Consumer 22/07/2014 Muat Turun 8,623
76 Gas Safety Guidelines for School Laboratory 06/07/2013 Muat Turun 6,608
77 Save Energy, Save the Environment for the Future 03/07/2013 Muat Turun 33,834
78 Jimat Tenaga, Lestarikan Alam Sekitar Untuk Masa Depan 03/07/2013 Muat Turun 24,458
79 Wayleave for Electricity Supply Lines 03/07/2013 Muat Turun 54,732
80 Electrical Engineers 03/07/2013 Muat Turun 68,274
81 Electrical Services Engineers 03/07/2013 Muat Turun 42,232
82 Pemasangan Pagar Elektrik Mengikut Prosedur Yang Ditetapkan Oleh Suruhanjaya Tenaga 03/07/2013 Muat Turun 127,257
83 Cable Jointers 03/07/2013 Muat Turun 66,237
84 Wireman 03/07/2013 Muat Turun 309,957
85 Chargeman 03/07/2013 Muat Turun 679,931
86 Electrical Supervisors 03/07/2013 Muat Turun 25,258
87 Guidelines On Domestic Gas Piping System 03/07/2013 Muat Turun 28,397
88 Guidelines for Copper Gas Piping 03/07/2013 Muat Turun 8,066
89 Gas Supply Acts and Regulations Guidelines 03/07/2013 Muat Turun 113,632
Lihat Semua Muat Turun