Muat Turun

    
No Tajuk Tarikh Pautan
1 Guidelines for Solar Photovoltaic Installation Under The Programme Of NEM Rakyat and NEM GoMEn In Peninsular Malaysia 05/02/2024 Muat Turun
2 Guidelines for Solar Photovoltaic Installation Under Net Offset Virtual Aggregations (NOVA) Programme For Peninsular Malaysia 05/02/2024 Muat Turun
3 Guidelines on The Implementation of Interval Billing Mechanism 11/01/2024 Muat Turun
4 Information Guide For Corporate Green Power Programme (For Solar PV Plant) 10/11/2023 Muat Turun
5 Guidelines on Minimum Energy Performance Standard (MEPS) for Electric Oven 08/11/2023 Muat Turun
6 Guidelines on Electricity Tariff Determination under IBR for Sabah and Federal Territory of Labuan 2023 07/08/2023 Muat Turun
7 Guidelines on Green Electricity Tariff 05/08/2023 Muat Turun
8 Guidelines on the Connection of Solar Photovoltaic Installation for Self-Consumption 15/07/2023 Muat Turun
9 Performance Standard of Electricity Supply Services of SESB 13/07/2023 Muat Turun
10 "Panduan Prosedur Tuntutan Kerugian Hasil oleh Pemegang Lesen bagi Kes-Kes Penggunaan Elektrik dengan Curang" 06/07/2023 Muat Turun
11 Guide on Gas Permit to Work System 30/05/2023 Muat Turun
12 Guidelines on Electricity Tariff Determination Under IBR for Peninsular Malaysia 2022 15/03/2023 Muat Turun
13 Guidelines on Electricity Tariff Determination Under IBR for Kulim Hi Tech Park 15/03/2023 Muat Turun
14 Guidelines for Single Buyer Sabah & F.T. Labuan 2023 01/03/2023 Muat Turun
15 Guidelines for System Operator Sabah & F.T. Labuan 2023.pdf 01/03/2023 Muat Turun
16 Guidelines on Best Available Technologies for Thermal Enery Efficiency of Boilers in Malaysia 21/02/2023 Muat Turun
17 Cogeneration: An Energy Efficient Technology (2022 Edition) 10/01/2023 Muat Turun
18 Guide on Electric Vehicle Charging System (EVCS) 29/07/2022 Muat Turun
19 "Garis Panduan Pendawaian Elektrik Pepasangan Domestik" 26/05/2022 Muat Turun
20 Guide to Efficient Use of Electricity at Home (2020 Edition) 27/01/2022 Muat Turun
21 Guide for Cross-Border Electricity Sales 24/10/2021 Muat Turun
22 Performance Standard of Electricity Supply Services of TNB 02/09/2021 Muat Turun
23 Guidelines on Electricity Tariff Determination Under Incentive Based Regulation (IBR) For Peninsular Malaysia 2021 17/05/2021 Muat Turun
24 Energy Efficiency Labelling Guideline for Freezer 17/03/2021 Muat Turun
25 Guidelines on Advanced Metering Infrastructure 08/07/2020 Muat Turun
26 Guidelines on Demarcation of Licence & Maintenance Downstream of City Gate Station 03/07/2020 Muat Turun
27 Energy Efficiency Labelling Guideline for Electric Rice Cooker 17/03/2020 Muat Turun
28 Guidelines on Gas Piping Systems at Launderettes and Similar Installations 17/03/2020 Muat Turun
29 Energy Efficiency Labelling Guideline for Microwave Oven 28/02/2020 Muat Turun
30 Energy Efficiency Labelling Guideline for Television 09/01/2020 Muat Turun
31 Guidelines for New Enhanced Dispatch Arrangement 12/12/2019 Muat Turun
32 Guide on the Subscription and Management of MyGreen+ 23/10/2019 Muat Turun
33 Guidelines on Large Scale Solar Photovoltaic Plant For Connection to Electricity Networks 14/02/2019 Muat Turun
34 Guideline on Submission of Business Plan 13/02/2019 Muat Turun
35 Guidelines for Setting Up Custody Transfer Metering Station at Entry and Exit Points 13/02/2019 Muat Turun
36 Guidelines on Electricity Tariff Determination Under Incentive Based Regulation (IBR) For Peninsular Malaysia 2018 27/12/2018 Muat Turun
37 Guidelines on Determination of Gas Distribution Facility Tariff Under Incentive-Based Regulation (IBR) 14/11/2018 Muat Turun
38 Guidelines on Determination of Gas Transportation Facility Tariff Under Incentive-Based Regulation (IBR) 14/11/2018 Muat Turun
39 Guidelines on Determination of Regasification Facility Tariff Under Incentive-Based Regulation (IBR) 14/11/2018 Muat Turun
40 Guidelines for Single Buyer Market (Peninsular Malaysia) 17/07/2018 Muat Turun
41 List of Regulated Electrical Equipment 07/06/2018 Muat Turun
42 Guideline for Electricity Meters: Approval, Testing and Initial Verification Requirements 05/06/2018 Muat Turun
43 Frequently Asked Questions on Third Party Access System 31/05/2018 Muat Turun
44 Guide on Issuance of Certificate of Approvals and Labelling of Domestic Gas Cooking Appliances 23/04/2018 Muat Turun
45 Guide on (1) Conduct of Repair Work and (2) Testing, Commissioning, Decommissioning and Recommissioning of Installations 11/04/2018 Muat Turun
46 Guide on Piped Gas Safety Management Plan and Programme 11/04/2018 Muat Turun
47 Energy Efficiency Labelling Guideline for Refrigerator 01/03/2018 Muat Turun
48 Energy Efficiency Labelling Guideline for Air-Conditioner 01/03/2018 Muat Turun
49 Energy Efficiency Labelling Guideline for Washing Machine 01/03/2018 Muat Turun
50 Guide on Applications for and Renewal for Certificate of Approval Assemblers, Manufacturers or Importers of Gas Fittings, Gas Appliances and Equipment & Gas Fittings, Gas Appliances and Equipment 02/01/2018 Muat Turun
51 Guidelines on Business Plan Submission by Licensee 01/08/2017 Muat Turun
52 Non-Domestic Electrical Installation Safety Code 05/07/2017 Muat Turun
53 Guideline for The Design, Installation, Inspection, Testing, Operation and Maintenance of Water Heater Systems 13/06/2017 Muat Turun
54 Guidelines on Connection Charges for Sabah Electricity Sdn. Bhd. (SESB) 20/04/2017 Muat Turun
55 Guideline on Electrical Safety Management Plan and Programme 30/03/2017 Muat Turun
56 Guidelines for Implementation of Gas Framework Agreement (GFA) in The Power Sector 28/03/2017 Muat Turun
57 Third Party Access Code for Malaysian Distribution Pipelines 16/01/2017 Muat Turun
58 Third Party Access Code for Malaysian Transmission Pipelines 16/01/2017 Muat Turun
59 Third Party Access Code for Malaysian Regasification Terminals 16/01/2017 Muat Turun
60 Guidelines on Licence Application 16/01/2017 Muat Turun
61 Guidelines on Competition for the Malaysian Gas Market in relation to Market Definition, Anti-Competitive Agreements and Abuse of Dominant Position 16/01/2017 Muat Turun
62 Guidelines For Ring-Fencing of The System Operator (Peninsular Malaysia) 2016 05/01/2017 Muat Turun
63 Electrical Energy Audit Guidelines for Building 26/10/2016 Muat Turun
64 Guidelines On Tariff Determination Under Incentive Based Regulation for Tenaga Nasional Berhad 13/10/2016 Muat Turun
65 Guidelines On Tariff Determination Under Incentive Based Regulation for Sabah Electricity Sdn. Bhd 13/10/2016 Muat Turun
66 Distribution Code for Peninsular Malaysia, Sabah & F.T. Labuan (Amendments) 2017 13/10/2016 Muat Turun
67 Grid Code for Sabah and Labuan (Amendments) 2017 13/10/2016 Muat Turun
68 Grid Code for Peninsular Malaysia 13/10/2016 Muat Turun
69 Guide to NEDA's Trial Run 05/10/2016 Muat Turun
70 Garis Panduan Pelaksanaan Pemeriksaan Berkala Dan Ujian Kebocoran Sistem Gas Berpaip 23/09/2016 Muat Turun
71 Garis Panduan Kaedah-Kaedah Keselamatan Pengguna Elektrik di Musim Banjir 10/12/2015 Muat Turun
72 Soalan-Soalan Lazim Isu Meter Elektrik 23/09/2014 Muat Turun
73 Guidelines on No-Cost and Low-Cost Measures for Efficient Use of Electricity in Buildings 13/08/2014 Muat Turun
74 Gas Piping System Safety Handbook For Domestic Consumer 22/07/2014 Muat Turun
75 Garis Panduan Persempadanan Pengurusan dan Penyenggaraan Sistem Pepasangan Elektrik dan Gas Berpaip di Bangunan 25/03/2014 Muat Turun
76 Guidelines On Licensing Under Section 9 of the Act [Electricity Supply Act 1990 (Act 447)] 15/08/2013 Muat Turun
77 Gas Safety Guidelines for School Laboratory 06/07/2013 Muat Turun
78 Save Energy, Save the Environment for the Future 03/07/2013 Muat Turun
79 Jimat Tenaga, Lestarikan Alam Sekitar Untuk Masa Depan 03/07/2013 Muat Turun
80 Guideline for Approval of Electrical Equipment 2018 (Electricity Regulation 1994) 03/07/2013 Muat Turun
81 Wayleave for Electricity Supply Lines 03/07/2013 Muat Turun
82 Electrical Engineers 03/07/2013 Muat Turun
83 Electrical Services Engineers 03/07/2013 Muat Turun
84 Pemasangan Pagar Elektrik Mengikut Prosedur Yang Ditetapkan Oleh Suruhanjaya Tenaga 03/07/2013 Muat Turun
85 Cable Jointers 03/07/2013 Muat Turun
86 Wireman 03/07/2013 Muat Turun
87 Chargeman 03/07/2013 Muat Turun
88 Electrical Supervisors 03/07/2013 Muat Turun
89 Guidelines On Domestic Gas Piping System 03/07/2013 Muat Turun
90 Guidelines for Copper Gas Piping 03/07/2013 Muat Turun
91 Gas Supply Acts and Regulations Guidelines 03/07/2013 Muat Turun
Lihat Semua Muat Turun