Could we clarify on the agency/entity responsible for conducting the PSS are LEGA, TNB, or approved consultants?

The Power System Study (PSS) will be conducted directly by the EUC. LEGA is required to engage with the EUC for initiating the study. Please refer to Appendix 2 of the Guideline on the application process flow.