Skip to main content

Secondary Menu

  • About Us
  • Sourcing
  • Resources
  • Newsroom
  • Contact Us
  • FAQ
  • English
  • Bahasa Melayu
Suruhanjaya Tenaga Suruhanjaya Tenaga Suruhanjaya Tenaga
  • English
  • Bahasa Melayu
Suruhanjaya Tenaga

Main navigation

Stakeholders

Public service channels, consumer rights, related support and information for energy users.

Electricity

Electricity

Gas

Gas

Energy Efficiency

Energy Efficiency

National Energy Outlook

National Energy Outlook

Awareness

Awareness

Training and Development

Training and Development

Security

Energy security, reliable supply, resilient systems and long-term national readiness.

System Average Interruption Duration Index (SAIDI)

System Average Interruption Duration Index (SAIDI)

System Average Interruption Frequency Index (SAIFI)

System Average Interruption Frequency Index (SAIFI)

System Average RMS Frequency Index (SARFI)

System Average RMS Frequency Index (SARFI)

Grid System Operation

Grid System Operation

Pricing

Electricity tariffs, gas facility tariff frameworks and market-based cost mechanisms across the energy sector.

Electricity Pricing Framework

Electricity Pricing Framework

Gas Facility Tariff Framework

Gas Facility Tariff Framework

Sustainability

Renewable energy, energy efficiency, conservation measures and transition initiatives that support a more sustainable energy future.

Energy Transition Programmes

Energy Transition Programmes

Market Structure & Access

Market Structure & Access

Partnership

Collaborations, procurement channels, investment initiatives, and ecosystem partnerships that drive scale.

ASEAN

ASEAN

International Collaboration

International Collaboration

National Collaboration

National Collaboration

ST Annual Regulatory Review

ST Annual Regulatory Review

Karnival Bijak Tenaga

Karnival Bijak Tenaga

Energy Regulatory Insight (ERI)

Energy Regulatory Insight (ERI)

Other topics

  • Pencarian Wira Bijak Tenaga 2026
FAQ CRESS
‹ CRESS

Apakah Kapasiti Suntikan (Injection Capacity) ke Grid? Adakah ia PV Export, kuasa BESS atau nilai lain di antaranya?

Kapasiti suntikan yang akan diukur meter adalah PV Export sahaja bagi tujuan pengebilan.

CRESS

What is the dispatch priority during solar energy generation? E.g. is it to fully charge the BESS first and export to grid once BESS is fully charged or vice versa? Or is the battery mainly to help firm up/smooth out the half-hourly firm output? ↗ Are there any limitations to the interconnection (export capacity) other than the PSS? i.e. Is the interconnection capacity set at 50% of the plant AC capacity? ↗ Under clause 8.14(a), the BESS is “dispatchable by GSO as per system requirements”. Under what circumstances will GSO be dispatching power from the BESS— i. Is this for emergency / occasional use only under unusual circumstances, and otherwise, the RED w ↗ Under clause 8.14(a), the BESS is “dispatchable by GSO as per system requirements”. Under what circumstances will GSO be dispatching power from the BESS— i. Is this for emergency / occasional use only under unusual circumstances, and otherwise, the RED w ↗ Are there any limitations to the interconnection (export capacity) other than the PSS? i.e. Is the interconnection capacity set at 50% of the plant AC capacity? ↗
Suruhanjaya Tenaga

Energy Commission,

No. 12, Jalan Tun Hussein,

Precinct 2,

62100 Putrajaya, Malaysia.

Toll Free: 1-800-2222-78

Tel: (603) 8870 8500

Fax: (603) 8888 8637

  • Career
  • Disclaimer
  • Privacy
  • Security

Follow Us On:

Recognitions

LRQA

Standards

UKAS

IQNET