With reference to section 8.20, to clarify, if an existing customer has a demand of 10MW and an additional new demand of 5MW, is the minimum threshold calculated as follows: 100% x 15MW x 0.52 x 730 hours?
Based on guideline, the calculation to set the minimum threshold under CRESS is as follows:-
8.20 For existing customers who participate with new additional demand, 100% of the existing maximum demand declared multiplied by the load factor of 0.52 x 730 (hours) will be used to set the minimum threshold under the CRESS programme. The minimum threshold will be used for billing calculation.
Minimum Threshold for billing = (10MW)*0.52*730 = 3,796,000kWh
CRESS
Section 6.11 of the CRESS Guidelines outlines that "The EUC shall carry out the billing process and issue the relevant bill to the Green Consumer based on meter readings at both RED (MRED) and Green Consumer (MGC) premises. The meter reading at RED and Gr
Referring to Clause 7.6 of the September CRESS Guidelines, which outlines that "The RED shall also enter into Backfeed Agreement with the EUC to obtain electricity supply for the plant's own consumption, backfeed requirement during construction, and other
Referring to Clause 6.14(b) of the September CRESS Guidelines outlines "EUC will issue an electricity bill to the Green Consumer for every billing cycle period, being: (a) the period beginning on the Commencement Date and ending on the date on which the f
RED’s Declared Monthly Energy Output = 1,000 MWh RED’s Actual Monthly Energy Output = 1,000 MWh GC’s Consumption = 1,200 MWh Balance consumption from TNB = 200 MWh Given the GC’s TNB Tariff is C2, which has a Peak tariff of RM 0.365/kWh and an off-peak t
Will there be MD be chargeable to Green Consumer?