Battery and Capacity Requirements
For section 8.14 (a) of the CRESS Guidelines, can we understand that for a 100MWac plant, the usable other than nominal capacity for BESS shall be at least 50MW/200MWh?
Yes.
Battery and Capacity Requirements
What is the Minimum Capacity Factor (CF) for Battery?
What is the Minimum Capacity Factor (CF) for Battery?
If we declare the firm capacity for the next day, how long the plant need to maintain the firm capacity (i.e 6 hour, 12 hours etc?)
Is a RED permitted to sign FCAS (Frequency Control Ancillary Services) agreements with the grid operator for a qualifying BESS system developed within a solar farm, as well as for standalone projects?
If we declare the firm capacity for the next day, how long the plant need to maintain the firm capacity (i.e 6 hour, 12 hours etc?)