What is the space requirement for battery storage?
The minimum space requirement to be provided by LEGA to EUC for LCSP integration is outlined in the DRESSA and illustrated in the figure below which consists of both sizing for brownfield and greenfield area. The developer shall appeal and propose a solution to EUC if the space requirement cannot be fulfilled.