For section 8.14 (a) of the CRESS Guidelines, can we understand that for a 100MWac plant, the usable other than nominal capacity for BESS shall be at least 50MW/200MWh?
For the case 50MW/200MWh above, do we need to meet the requirement every day over the PPA term, that every day the plant shall have the capability to inject 200MWh energy to the grid system directly from BESS, even on bad weather days, when the PV system may not generate enough power to ensure full charge of BESS? Is there an inspection & test method and procedure regarding this?
CRESS Acceleration Package
Who pays the SAC under the Acceleration Package?
What fixed SAC rate is offered for RED under the CRESS Acceleration Package?
Will the fixed SAC rate for RED be reviewed during the 10-year period?
Why is the SAC for RED fixed for 10 years?
What SAC rate will be paid by the GC under the CRESS Acceleration Package?
What cost components are considered in the SAC framework for both RED and GC?
Why should the GC bear part of the CRESS-related cost?
Will a GC be charged twice for network access?