Energy Transition Program
Corporate Green Power Programme
Please advice if 132kV substation that is not in the list is allowed if preliminary check with PSS consultant shows that injection is feasible.
Is Full PSS is required for NEDA? or PSS stage 1?
If PSS rejected by TNB at NEDA stage, does it meant the CGPP application will be fully rejected?
Can interconnection solution be changed later if the PSS is not favourable?
CRESS
With reference to section 6.11, it states that “The meter reading at RED and Green Consumer premises shall be coordinated in such a way that the readings reflect the supply and consumption of electricity that occur within the same time during the Billing Period.” What does “same time” entail? Is this down to the very minute and hour, or is this referring to the same monthly/billing cycle during the Billing Period? This section does seem to contradict sections 6.20 and 8.12.
With reference to section 14.1(a), in the event that the GEP is not implemented according to schedule or not completed by the scheduled COD, the Commission reserves the right to revoke the participant. Does this mean that there is a sunset COD stipulated under CRESS that the RED needs to comply with?
Similarly to the CGPP, will there be a commitment bond imposed on the RED?
How is ST regulating the point of interconnection? With the understanding that “LSS5” still yet to award.
With reference to the definition “EUC”, does this include other licenced EUC that is not part of the TNB group?
With reference to section 7.8, do clarify who are the “relevant parties” involved when the generation and consumption data of RED and Green Consumer is shared? Is the sharing limited to billing purposes?