Grid Connection and Technical Requirements

Refer to the following: i. PV Export = Solar Farm Export Capacity in MWac. ii.BESS Power = energy storage power capacity in MWac. What is the Injection Capacity to the Grid? Is it PV Export, BESS Power or other values in between?

The injection capacity that will be metered is only PV Export for billing purposes.