Green Consumer and Renewable Energy Developer (RED) Policies
With reference to section 6.5, we understand that a RED is allowed to contract with more than 1 Green Consumer, but can a RED have more than 1 project site for 1 Green Consumer? Example 1: Green Consumer with a demand of 150 MW under 2 site locations (100 MW and 50 MW).
Under the Guidelines, a Green Consumer is allowed to source green electricity from more than one RED up to its maximum energy as declared in the CRESA with the EUC.
Green Consumer and Renewable Energy Developer (RED) Policies
What rules govern the maximum demand the offtaker states in their CRESA and will this be in MW (vs MWh)? Will this be the same as CGPP where the offtaker’s ability to contract is capped by their max demand in MW?
With respect to the classification of a new Green Consumer, we are enquiring on behalf of a potential data centre off-taker, with an ESA for a 450 MVA connection with TNB. The data centre site has already energised at a very minimal power usage for testing and commissioning in preparation for their client in Q1 and Q2 next year. Can they still be considered as a new Green Consumer under CRESS?
What rules govern the maximum demand the offtaker states in their CRESA and will this be in MW (vs MWh)? Will this be the same as CGPP where the offtaker’s ability to contract is capped by their max demand in MW?
With respect to the classification of a new Green Consumer, we are enquiring on behalf of a potential data centre off-taker, with an ESA for a 450 MVA connection with TNB. The data centre site has already energised at a very minimal power usage for testing and commissioning in preparation for their client in Q1 and Q2 next year. Can they still be considered as a new Green Consumer under CRESS?
Based on the following situation, is the customer allowed to participate in CRESS for Factory 1 since it will be energised in the future?