Grid Connection and Technical Requirements
What is the AC/DC ratio acceptable for the scheme?
The DC/AC ratio is up to the developer.
Grid Connection and Technical Requirements
Are there any limitations to the interconnection (export capacity) other than the PSS? i.e. Is the interconnection capacity set at 50% of the plant AC capacity?
With reference to section 8.10, in the event of a withdrawal of Green Consumer, can the RED reapply to participate in CRESS if they found a new Green Consumer to replace the one who had withdrawn? Will that new Green Consumer need to be a new electricity user?
What is the AC/DC ratio acceptable for the scheme?