Frequently Asked Questions
Electricity
Lightning Protection System
Does this Directive apply to all categories of buildings, whether new or existing?
Based on the Answer to Question 3, does this mean that all buildings subject to this Directive are required to install a Lightning Protection System (LPS)?
Who may be appointed to carry out the Risk Assessment, design, supervision and completion, testing, and maintenance of the LPS?
How can I obtain the services of an Electrical Services Contractor or Electrical Contractor?
Adakah Arahan ini terpakai kepada projek pembangunan baru yang belum mendapat Kebenaran Merancang (KM)?
Does this Directive apply if a residential building is completed in 2020 while Planning Permission (KM) was obtained before this Directive was issued?
What about existing buildings, for example residential flats or landed terrace houses that are already 30 years old?
Is the installation of a Surge Protective Device (SPD) in a building mandatory?
Is the use of non-conventional lightning protection systems such as Early Steamer Emission (ESE), Charge Transfer System (CTS), and others permitted?
If a building category is not listed, does this mean that building does not need to comply with this Directive?